Library

Repository of drilling documents and publications for the ice science community

Document Details

Next generation of an intermediate depth drill
Authors: Johnson JA, Shturmakov AJ, Kuhl TW, Mortensen NB, Gibson CJ
Year: 2014
Keywords: ice coring, ice engineering
Periodical/Journal: Annals of Glaciology
Volume: 55
Number: 68
Page Range: 27-33
Abstract:

Many of the ice-coring objectives in the Ice Drilling Program Office (IDPO) Long Range Science Plan, such as those in the International Partnerships in Ice Core Sciences (IPICS) 2k array and 40k network, are attainable in many locations with an intermediate depth drill (IDD) that can collect core from a fluid-filled hole down to 1500 m depth. The Ice Drilling Design and Operations (IDDO) group has designed and is in the process of building an agile IDD to meet this objective. The drill tent, power distribution and core-processing systems are an integral part of the IDD, which can be deployed by small aircraft and assembled by hand to minimize logistic requirements. The new drill system will be ready for testing in Greenland beginning in late spring 2014. The first production drilling is scheduled for the 2014/15 field season at the South Pole.

DOI: 10.3189/2014AoG68A011
URL: View document