ASIG Drill in operation at Pirrit Hills, Antarctica, during the 2016-2017 summer field season. Photo: Tanner Kuhl
A section of the 8-meters of rock core collected with the ASIG Drill at Pirrit Hills, Antarctica, during the 2016-2017 summer field season. Photo: Tanner Kuhl
IDP drillers Clayton Armstrong (at left) and Mike Jayred (at right) operating the ASIG Drill at Pirrit Hills, Antarctica, during the 2016-2017 summer field season. Photo: Tanner Kuhl