To learn more about this piece of equipment, visit the Foro 400 Drill webpage.
To learn more about this piece of equipment, visit the Foro 400 Drill webpage.
Etienne Gros operates the Foro 400 Drill on Canisteo Peninsula, Antarctica, during the 2023/24 field season. Credit: Peter Neff
IDP engineer and driller Elliot Moravec operates the Foro 400 Drill at a field site near Tunu, Greenland, during the 2022 field season. Credit: Tanner Kuhl.