Science Requirements: Foro 3000 Drill

Title Science Requirements: Foro 3000 Drill
Publication Type
Document
Year
2018
Author(s) Eric J Steig , TJ Fudge, Ryan Bay, Robert Hawley, IDPO
Pagination
1-3
Date Published
Abstract

The IDPO Science Advisory Board identified in the IDPO Long Range Science Plan 2016-2026 a need to investigate adaptation of an existing drill to minimize logistical requirements and time on site for deep ice coring. The first requirements were finalized on April 20, 2017. In consideration of replicate coring capability for the Foro 3000, from discussions organized by IDPO with iterative discussions between IDPO, scientists, and IDDO staff, the following are the science requirements for the Foro 3000 drill.

File
Special Collections IDP Documents, Science Requirements (IDP Equipment)
Categories Deep Drilling
Equipment Foro 3000 Drill, Intermediate Depth Drill (U.S.)
Citation Eric J Steig , TJ Fudge, Ryan Bay, Robert Hawley, IDPO ( 2018 ) Science Requirements: Foro 3000 Drill. 1-3 .
Lead Author
Eric J Steig