Science Requirements: Foro 3000 Drill
Title | Science Requirements: Foro 3000 Drill |
---|---|
Publication Type |
Document
|
Year |
2018
|
Author(s) | Eric J Steig , TJ Fudge, Ryan Bay, Robert Hawley, IDPO |
Pagination |
1-3
|
Date Published |
|
Abstract |
The IDPO Science Advisory Board identified in the IDPO Long Range Science Plan 2016-2026 a need to investigate adaptation of an existing drill to minimize logistical requirements and time on site for deep ice coring. The first requirements were finalized on April 20, 2017. In consideration of replicate coring capability for the Foro 3000, from discussions organized by IDPO with iterative discussions between IDPO, scientists, and IDDO staff, the following are the science requirements for the Foro 3000 drill. |
File |
SciReq_Foro 3000 drill V2_Final_4-11-2018.pdf (448.14 KB)
|
Special Collections | IDP Documents, Science Requirements (IDP Equipment) |
Categories | Deep Drilling |
Equipment | Foro 3000 Drill, Intermediate Depth Drill (U.S.) |
Citation | Eric J Steig , TJ Fudge, Ryan Bay, Robert Hawley, IDPO ( 2018 ) Science Requirements: Foro 3000 Drill. 1-3 . |
Lead Author |