Intermediate Depth Drill

Displaying 1 - 8 of 8
Citation Year
Eric J Steig, TJ Fudge, Ryan Bay, Robert Hawley, IDPO (2018) Science Requirements: Foro 3000 Drill. 1-3. 2018
Kyle Zeug (2018) Replicate Coring System for 98mm Electromechanical Drill - Whipstock Conceptual Documentation. 1-16. 2018
Kimberly A Casey, TJ Fudge, Thomas A Neumann, Eric J Steig, Marie GP Cavitte, Donald D Blankenship (2014) The 1500 m South Pole ice core: recovering a 40 ka environmental record. Annals of Glaciology, 55, (68), 137-146. doi: 10.3189/2014AoG68A016. https://doi.org/10.3189/2014AoG68A016 2014
Jay A Johnson, Alexander J Shturmakov, Tanner W Kuhl, Nicolai B Mortensen, Chris J Gibson (2014) Next generation of an intermediate depth drill. Annals of Glaciology, 55, (68), 27-33. doi: 10.3189/2014AoG68A011. https://doi.org/10.3189/2014AoG68A011 2014
IDDO (2013) Intermediate Depth Drill Final System Engineering Design Review (20 March 2013). 1-87. 2013
IDDO (2012) Intermediate Depth Drill Science Review (17 October 2012). 1-61. 2012
IDPO-IDDO (2012) Intermediate Depth Drill Development: Summary Document April 2012. 1-63. 2012
Eric Saltzman, Eric J Steig, IDPO (2011) Intermediate Ice Coring Drill - Science Requirements. 1-2. 2011