The logging tower strapped to spare borehole casing inside the IDP-Wisconsin warehouse. Photo: Unknown
The logging tower in use strapped to a borehole. Photo: Unknown
The intermediate depth logging winch in operation at Siple Dome, Antarctica, during the 2013-2014 summer field season. The logging tower is strapped to the Siple Dome borehole casing. Credit: Josh Jetson