Rapid deployment of camp facilities utilizing point-supported structures
Title | Rapid deployment of camp facilities utilizing point-supported structures |
---|---|
Publication Type |
Journal Article
|
Year |
1994
|
Author(s) | Victor B Mimken , Kevin C Curtis |
Journal/ Publication |
Memoirs of National Institute of Polar Research. Special issue 49
|
Pagination |
377-385
|
ISSN |
03860744
|
Abstract |
The work described in this paper summarizes the design and initial field testing of a point support foundation system for structures placed on snow. The foundation members consist of augers which can easily be driven into the snow by hand. A load frame and instrumentation package located at the Greenland Ice Sheet Program-Phase II (GISP II) are described, as well as the initial proof-of-concept testing prior to field deployment. |
File |
contents110000010345.pdf (660.01 KB)
|
URL | |
Special Collections | International Workshop on Ice Drilling Technology Series, 4th International Workshop on Ice Drilling Technology |
Categories | Field Logistics/Camps |
Citation | Victor B Mimken , Kevin C Curtis ( 1994 ) Rapid deployment of camp facilities utilizing point-supported structures. Memoirs of National Institute of Polar Research. Special issue 49 , 377-385 . |
Lead Author |