Skip to main content
Toggle navigation
Main navigation
About
About
Our Team
Contact Us
Requesting Field Support
Long Range Science Plan
Science Advisory Board
Englacial and Subglacial Access Working Group
Ice Core Working Group
Technical Assistance Board
Vision & Mission
Jobs
Equipment
Inventory
Availability
Comparison
Development
Request
Decommissioned
Fieldwork
Current and Upcoming
Completed
Resources
IDP Code of Conduct
Contact Us
Requesting Field Support
Long Range Science Plan
Long Range Drilling Technology Plan
Subscribe to Our Mailing List
Equipment Information Request Form
News
News
Ice Bits Newsletter
News Sign-up
Media
Media
Media Contact
Subscribe to Our Mailing List
IDP Policy for Acknowledgements
Photo Gallery
Library
Library Directory
All Library Documents
Recently Added Documents
Publications
Education
Education & Outreach Website
Outreach Support
Contact Us
Library of technical ice drilling documents
Home
Library
IDP Documents
IDP Documents
Displaying 51 - 75 of 86
Citation
Year
NSF Ice Drilling Program (2019)
USGS Deep Logging Winch Operations and Maintenance Manual
. 1-23.
2019
Richard R Forster, Lora Koenig, Peter D Neff, Eric J Steig, IDPO (2018)
Science Requirements: IDDO Electrothermal Drill
. 1-5.
2018
IDDO (2018)
Foro 3000 Drill Design Review - September 25, 2018
. 1-34.
2018
Eric J Steig, TJ Fudge, Ryan Bay, Robert Hawley, IDPO (2018)
Science Requirements: Foro 3000 Drill
. 1-3.
2018
Kyle Zeug (2018)
Replicate Coring System for 98mm Electromechanical Drill - Whipstock Conceptual Documentation
. 1-16.
2018
Sridhar Anandakrishnan, Paul Winberry, IDPO (2017)
Science Requirements: RAM Drill
.
2017
Chris J Gibson, Jay A Johnson, Grant Boeckmann (2017)
Rapid Air Movement (RAM) Drill Upgrade Concept Overview
. 1-18.
2017
Joshua J Goetz, Chris J Gibson (2017)
Sediment Laden Lake Ice Drill Concept Overview
. 1-7.
2017
Joshua J Goetz (2017)
Sediment Laden Lake Ice Drill Conceptual Design Review
. 1-15.
2017
IDDO (2017)
Foro 3000 Drill Conceptual Design Review
. 1-25.
2017
IDDO (2017)
Logging Tool Testing: An Informational Guide - Logging Tool Equipment Testing at IDDO
. 1-13.
2017
IDDO (2017)
Rapid Air Movement (RAM) Drill Upgrade Conceptual Design Review
. 1-26.
2017
Jay A Johnson, Matthew J Kippenhan (2017)
DISC Drill vs. Foro 3000 Drill Analysis
. 1-24.
2017
Jay A Johnson, Grant Boeckmann (2017)
Foro 3000 Drill Concept Overview
. 1-14.
2017
IDPO-IDDO (2016)
Strategic and Implementation Plan: Ice Drilling Program Office - Ice Drilling Design and Operations
. 1-39.
2016
Albrecht Karle, Michael Duvernois, IDPO (2016)
Science Requirements: RAMARA Drill
.
2016
Erich Osterberg, Karl Kreutz, Sarah Das (2016)
Science Requirements: Stampfli 2-Inch Drill
.
2016
Peter Doran, Stacy Kim, John C Priscu, IDPO (2015)
Science Requirements: Sediment Laden Lake Ice Drill
. 1-3.
2015
IDDO (2015)
Agile Sub-Ice Geological Drill System Design Review
. 1-72.
2015
IDDO (2015)
Foro Drill System Preliminary Engineering Design Review
. 1-26.
2015
Sarah Das, David Holland, Ted Scambos, IDPO (2014)
Science Requirements: Scalable Hot Water Access Drill
. 1-3.
2014
John W Goodge, Jeffrey P Severinghaus, IDPO (2014)
Science Requirements: Rapid Access Ice Drill
. 1-4.
2014
John Stone, Jaakko Putkonen, Edward Brook, IDPO (2014)
Science Requirements: Agile Sub-Ice Geological Drill
. 1-2.
2014
IDDO (2013)
Intermediate Depth Drill Final System Engineering Design Review (20 March 2013)
. 1-87.
2013
Michael D Gerasimoff, IDDO, John W Goodge (2012)
Rapid Access Ice Drill: A Drilling System Equipped for Rapid Transit over Glacial Ice, Equipped for On-the-Fly Ice Coring and Subglacial Rock Coring, and Suitable for Regional Geological Mapping and Glaciology
. 1-5.
2012
Pagination
First page
« First
Previous page
‹ Previous
Page
1
Page
2
Current page
3
Page
4
Next page
Next ›
Last page
Last »