IDP Documents

Displaying 26 - 50 of 72
Citation Year
U.S. Ice Drilling Program (2020) Rapid Air Movement Drill 2 Operations and Maintenance Manual Configuration-1. 1-11. 2020
Chris J Gibson (2019) ASIG‐Air Drop Test Report. Document #8323‐0025, 1-9. 2019
U.S. Ice Drilling Program (2019) 4-Inch Drill Operations and Maintenance Manual. 1-40. 2019
U.S. Ice Drilling Program (2019) Agile Sub-Ice Geological Drill Operations and Maintenance Manual. 1-23. 2019
U.S. Ice Drilling Program (2019) Deep Logging Winch Operations and Maintenance Manual. 1-11. 2019
U.S. Ice Drilling Program (2019) Eclipse Drill Operations and Maintenance Manual. 1-69. 2019
U.S. Ice Drilling Program (2019) Field Project Support Requirements. 1-2. 2019
U.S. Ice Drilling Program (2019) IDP Policy on drilling support to scientists who are not funded by NSF. 1. 2019
U.S. Ice Drilling Program (2019) PICO Hand Auger Operations and Maintenance Manual. 1-32. 2019
U.S. Ice Drilling Program (2019) Prairie Dog Drill Operations and Maintenance Manual. 1-14. 2019
U.S. Ice Drilling Program (2019) Sediment Laden Lake Ice Drill Operations and Maintenance Manual. 1-18. 2019
U.S. Ice Drilling Program (2019) USGS Deep Logging Winch Operations and Maintenance Manual. 1-23. 2019
Richard R Forster, Lora Koenig, Peter D Neff, Eric J Steig, IDPO (2018) Science Requirements: IDDO Electrothermal Drill. 1-5. 2018
IDDO (2018) Foro 3000 Drill Design Review - September 25, 2018. 1-34. 2018
Eric J Steig, TJ Fudge, Ryan Bay, Robert Hawley, IDPO (2018) Science Requirements: Foro 3000 Drill. 1-3. 2018
Kyle Zeug (2018) Replicate Coring System for 98mm Electromechanical Drill - Whipstock Conceptual Documentation. 1-16. 2018
Sridhar Anandakrishnan, Paul Winberry, IDPO (2017) Science Requirements: RAM Drill. 2017
Chris J Gibson, Jay A Johnson, Grant Boeckmann (2017) Rapid Air Movement (RAM) Drill Upgrade Concept Overview. 1-18. 2017
Joshua J Goetz, Chris J Gibson (2017) Sediment Laden Lake Ice Drill Concept Overview. 1-7. 2017
Joshua J Goetz (2017) Sediment Laden Lake Ice Drill Conceptual Design Review. 1-15. 2017
IDDO (2017) Foro 3000 Drill Conceptual Design Review. 1-25. 2017
IDDO (2017) Logging Tool Testing: An Informational Guide - Logging Tool Equipment Testing at IDDO. 1-13. 2017
IDDO (2017) Rapid Air Movement (RAM) Drill Upgrade Conceptual Design Review. 1-26. 2017
Jay A Johnson, Matthew J Kippenhan (2017) DISC Drill vs. Foro 3000 Drill Analysis. 1-24. 2017
Jay A Johnson, Grant Boeckmann (2017) Foro 3000 Drill Concept Overview. 1-14. 2017